Client
SREST
Secretaria Regional do equipamento Social e Transportes
Location
Madeira, Portugal
What we worked on
Construction of the Machico–Caniçal Expressway, including the Caniçal Twin Tunnel
Completion date
2004
The project wok consisted of a set of two double-section tunnels and a viaduct. The average length of the section is 2100m.
The Expressway platformed is composed of two carriageways with 6,5m wide, two lanes with 3,25m each and exterior kerbs with 2m and interior kerbs with 0,25m.
Explore related projects
Contact us
Get in touch with ZAGOPE to learn more about our work, our projects, and the solutions we can develop together.