Anaerobic Digestion Plant of Abrunheira
Client: TRATOLIXO – Tratamento de Resíduos Sólidos EIM
Location: Mafra, Portugal
Period: August / 2008 to January / 2011
Main characteristics:
The project work consisted of the design and construction of a BMW (biodegradable municipal waste) waste-to-energy unit, in Portugal, with capacity for 125.000 t/year.
In addition to the execution process, works include the process specialties, foundations and structure, architecture, landscaping, roads, water and sewage, electrical installations and instrumentation, HVAC, WWTP and noise.