Expressway Machico-Caniçal
Client: SREST-Secretaria Regional do equipamento Social e Transportes
Location: Caniçal, Machico, Madeira Island, Portugal
Period: June /2003 to October /2004
Main characteristics:
The project wok consisted of a set of two double-section tunnels and a viaduct. The average length of the section is 2100m.
The Expressway platformed is composed of two carriageways with 6,5m wide, two lanes with 3,25m each and exterior kerbs with 2m and interior kerbs with 0,25m.