WWTP of Setúbal
Client: Municipality of Setúbal
Location: Setúbal, Portugal
Period: April / 2000 to May / 2002
Main characteristics:
This project work, with a nominal capacity of 27.922 m³/day, consisted of the design/construction of a WWTP, including civil construction works and electromechanical equipment for a population of 253.107 inhabitants, with a global length of 1.700 m of collector pipelines.